MindMap Gallery Precautions for house acceptance
According to the commercial housing acceptance standards of the People's Republic of China, a detailed explanation of the housing acceptance made by novices. Students in need can save it.
Edited at 2022-04-10 20:44:18El cáncer de pulmón es un tumor maligno que se origina en la mucosa bronquial o las glándulas de los pulmones. Es uno de los tumores malignos con mayor morbilidad y mortalidad y mayor amenaza para la salud y la vida humana.
La diabetes es una enfermedad crónica con hiperglucemia como signo principal. Es causada principalmente por una disminución en la secreción de insulina causada por una disfunción de las células de los islotes pancreáticos, o porque el cuerpo es insensible a la acción de la insulina (es decir, resistencia a la insulina), o ambas cosas. la glucosa en la sangre es ineficaz para ser utilizada y almacenada.
El sistema digestivo es uno de los nueve sistemas principales del cuerpo humano y es el principal responsable de la ingesta, digestión, absorción y excreción de los alimentos. Consta de dos partes principales: el tracto digestivo y las glándulas digestivas.
El cáncer de pulmón es un tumor maligno que se origina en la mucosa bronquial o las glándulas de los pulmones. Es uno de los tumores malignos con mayor morbilidad y mortalidad y mayor amenaza para la salud y la vida humana.
La diabetes es una enfermedad crónica con hiperglucemia como signo principal. Es causada principalmente por una disminución en la secreción de insulina causada por una disfunción de las células de los islotes pancreáticos, o porque el cuerpo es insensible a la acción de la insulina (es decir, resistencia a la insulina), o ambas cosas. la glucosa en la sangre es ineficaz para ser utilizada y almacenada.
El sistema digestivo es uno de los nueve sistemas principales del cuerpo humano y es el principal responsable de la ingesta, digestión, absorción y excreción de los alimentos. Consta de dos partes principales: el tracto digestivo y las glándulas digestivas.
House acceptance
File information
document
Important attention
"House Acceptance Handover Form"
Confirm everything before signing
View must-have items
"Residential Quality Guarantee"
"Residential Owner's Manual"
Must have
Pipeline distribution as-built drawings/project as-built drawings/design unit construction drawings
Originals can be taken away
summary
"Construction Project Quality Certification"
"Real Estate Development and Construction Project Comprehensive Acceptance Certificate"
"Completion Acceptance Record Form"
There must be rules
Photocopies available
Area measurement table
Must have
Indicate when signing
The condition of the house is unknown
Tool list
tape measure
Pen and paper
Door
Entrance door
On-site confirmation and timely replacement if there is any problem
Precautions
Clean and scratch-free surface
Corner cuts and seams are tight and complete
The gaps between the door and the wall are tight and full
The deviation does not exceed 2-3mm
process
door frame
Smooth\Dense
door leaf
No deformation\cracking\scratches\reserved decoration position from the ground
door lock
Firm\smooth
turn on
Smooth and smooth o wear
door handle
Firm and smooth o changes in behavior
seal
Door gap ≤2.5mm
ground
No empty drum
Dense o cracks
smooth
Need waterproofing
The slope direction is correct
No standing water
Whether to reserve the method for decorating the floor
wall
empty drum
water leakage
crack
smooth
water proof
If there are drainage requirements, drainage lines/troughs are required
Verticality
Water and electricity
waterway
Valve\Faucet
Reasonable location
switch normal
smooth waterway
water meter
Installation compliance
The joints are tight and intact
No idling
The table value is the initial value
Drainage pipe
floor drain
Complete, reasonable and strict
Is there construction waste?
circuit
Distribution box
Turn off the power
Operate indoor switches\check sockets
Determine whether the power can be cut off normally
electricity meter
No idling after closing the main gate
switch socket
Insurance socket
30cm above the ground are all equipped with safety devices
Moisture-proof sockets in the bathroom
There should be no socket above the wash basin
Pen/phaser
illumination
Weak current system
Note: The vertical distance between strong and weak electricity exceeds 1m, otherwise it will affect the TV viewing effect in the future.
access control
Security, etc.
water proof
The surface of the waterproof layer is smooth o bubbling and wrinkles\crisp, cracked and sandy, etc.
Pay attention to the roof
Whether there is mold\watermark
include
bathroom
balcony
kitchen
Do a 24-hour water closure test when taking over the building
roof
exterior wall
Exterior wall doors and windows
air conditioning hole
doors and windows
Sealing
structural compliance
other
flue
clogged
Return to smoke
sewage pipe
crack
water seal
Betrayal, etc.
Are the position and cavity of the air conditioner correct?
Whether there are exposed wires
Copy electric meter, water meter and gas meter values
Accessories
Dedicated postal box
Problem solving
There is a problem
Developer’s stamp and confirmation