MindMap Gallery Acceptance report v5(1)
The acceptance report is divided into several modules: determining the PPT report structure, project construction review, project construction results, project follow-up arrangements, and new future prospects. Interested friends can download and collect it~
Edited at 2022-06-23 10:54:44El cáncer de pulmón es un tumor maligno que se origina en la mucosa bronquial o las glándulas de los pulmones. Es uno de los tumores malignos con mayor morbilidad y mortalidad y mayor amenaza para la salud y la vida humana.
La diabetes es una enfermedad crónica con hiperglucemia como signo principal. Es causada principalmente por una disminución en la secreción de insulina causada por una disfunción de las células de los islotes pancreáticos, o porque el cuerpo es insensible a la acción de la insulina (es decir, resistencia a la insulina), o ambas cosas. la glucosa en la sangre es ineficaz para ser utilizada y almacenada.
El sistema digestivo es uno de los nueve sistemas principales del cuerpo humano y es el principal responsable de la ingesta, digestión, absorción y excreción de los alimentos. Consta de dos partes principales: el tracto digestivo y las glándulas digestivas.
El cáncer de pulmón es un tumor maligno que se origina en la mucosa bronquial o las glándulas de los pulmones. Es uno de los tumores malignos con mayor morbilidad y mortalidad y mayor amenaza para la salud y la vida humana.
La diabetes es una enfermedad crónica con hiperglucemia como signo principal. Es causada principalmente por una disminución en la secreción de insulina causada por una disfunción de las células de los islotes pancreáticos, o porque el cuerpo es insensible a la acción de la insulina (es decir, resistencia a la insulina), o ambas cosas. la glucosa en la sangre es ineficaz para ser utilizada y almacenada.
El sistema digestivo es uno de los nueve sistemas principales del cuerpo humano y es el principal responsable de la ingesta, digestión, absorción y excreción de los alimentos. Consta de dos partes principales: el tracto digestivo y las glándulas digestivas.
Acceptance report
0Determine the PPT report structure
Level 1 is the PPT chapter
Level 2 is the PPT title of each page
1. Project construction review
Project Objectives
Construction process
Timeline (start-admission-research-plan-implementation and development-testing-trial-first-phase online-AK switching-second-phase iteration online)
first stage
Official documents, official document transmission, archives, supervision, information collection
The second stage includes comprehensive affairs (meetings, schedules), confidential equipment, confidential passwords, personal trips abroad, foreign affairs, requests for leave, etc.
Construction difficulties
Domestic environment adaptation
Terminal adaptation (meeting x86, AK phase II and phase III terminals)
Browser, WPS, scholar, plug-in
Server-side adaptation (meet Ak/x86 server environment and basic software adaptation)
Renmin University of Finance and Economics
Dongfangtong
operating system
Function performance optimization
Overall deployment architecture optimization
Business function scenario optimization
Query list opening speed optimization
Statistical report performance optimization
Optimized file download and document opening speed
Text opening speed optimization
Multi-vendor collaborative optimization
Related manufacturers and resource coordination
Coordination and cooperation with original old system manufacturers
Some old systems have no business departments
Difficulty in migrating historical data
Different system architectures and different data structures make it difficult to implement migration technology
There is too much business data, it takes a long time, and there are many changes, making migration more difficult.
M-related system data migration needs to pay attention to the post-launch migration schedule, which takes a long time
Complex and changing needs
Affected by the epidemic
AB class, isolation of key project personnel, etc.
2. Project construction results
Overall architecture
Overall system architecture diagram
Introduction to construction results
Introducing the highlights by module, comparing the old and new systems, and what should be improved
Rich query statistical reports? ? ?
system integration
Identity authentication
Unified certification
Scholar (format, signature)
Signature, format documents
New generation plus M card
WPS2019
Engraving system
Unified certification
secure email
Historical data migration status
Issuing, receiving, filing, supervising
second stage module
File cabinet function
Introduction to system operation
System function coverage, how many old systems have been replaced, respectively?
Documents
Received
Official document transmission
file
supervise
foreign affairs
general affairs
Confidential equipment
Confidential password
emergency management
Going abroad for personal reasons
please take leave
Public Mailbox
How much organizational structure and personnel information is covered?
How many registered users, organizations and departments are there?
Covering organizational changes...
Foreign exchange bureau
System login status (overall, average, peak period, etc.)
Process initiation, approval, completion, etc. (quantity)
Other function usage
Number of files archived and number pending approval
Quantity used in supervision process
Information Collection
Number of documents?
Phase 2 situation?
other
How many processes are covered, how many processes are added, how many processes are optimized, analysis
Official document
Sending, receiving, and transmitting official documents
supervise
file
Information Collection
second stage
other
System daily login status and peak period login status (3pm-4pm)
System process usage and analysis
System problems and requirements, analysis
Collected questions and needs
Solve the situation
4. Xinchuang’s future outlook
Xinchuang’s future outlook
The development direction of the Xinchuang Collaboration Platform itself
Excellent cases in the industry
3. Project follow-up arrangements
Project follow-up arrangements
Daily operation and maintenance work
System problem operation and maintenance processing
Operation and maintenance guidance and cooperation
System problem repair and rule optimization process
Demand processing
Promote acceptance work
Complete acceptance documents
Historical data migration
Expand the construction of high-quality projects